S-T01: Extended GHZ Validation - Rationale¶
Experiment ID: S-T01 Workstream: S (Shadows) Status: Planned (Target: Nov 2025) Phase: Phase 1 Foundation & R&D
Overview¶
S-T01 extends the GHZ smoke tests (SMOKE-SIM, SMOKE-HW) to provide statistically rigorous validation of classical shadows on IBM quantum hardware. This experiment runs ≥10 independent trials with connectivity-aware circuit layouts to demonstrate SSR ≥ 1.1× and CI coverage ≥ 80% under realistic noise conditions - both critical Phase 1 exit criteria.
Scientific Rationale¶
Why This Experiment?¶
-
Statistical Significance: Single hardware trials (SMOKE-HW) insufficient for Phase 1 gate review. Need ≥10 trials to compute SSR with confidence intervals.
-
Phase 1 Exit Criterion: Roadmap requires "SSR ≥ 1.1× on IBM hardware" - S-T01 provides the evidence.
-
Noise Characterization: Multiple trials quantify run-to-run variance from calibration drift, queue-dependent errors, and stochastic noise.
-
Connectivity-Aware Validation: Test on 4-5 qubit GHZ with hardware topology constraints (not just 3-qubit linear).
-
Baseline for v1 Comparison: S-T01 (v0 baseline) + S-T02 (v1 noise-aware) pair enables direct mitigation effectiveness measurement.
Connection to Larger Research Plan¶
Phase 1 Critical Path:
SMOKE-HW ──> S-T01 (≥10 trials, connectivity-aware) ──> Phase 1 Gate Review
│ │
├─> SSR ≥ 1.1× validation │
├─> CI coverage ≥ 80% validation │
└─> Enables S-T02 (v1 comparison baseline) └─> Phase 2 Entry
Unblocks: - Phase 1 completion (provides SSR evidence) - S-T02 noise-aware comparison (needs S-T01 baseline) - Cross-workstream confidence (if shadows work for GHZ, chemistry/QAOA credible)
Expected Outcomes and Success Criteria¶
Primary Success Criteria¶
| Criterion | Target | Rationale |
|---|---|---|
| SSR (mean) | ≥ 1.1× | Phase 1 exit requirement |
| SSR Stability | σ_SSR < 0.3 | Consistent performance |
| CI Coverage | ≥ 80% | Statistical validity |
| Trial Count | ≥ 10 | Statistical power |
| System Size | 4-5 qubits | Connectivity-aware scaling |
Observable Targets¶
- 4-qubit GHZ: Estimate 7 observables (4Z + 3ZZ), SSR ≥ 1.1× per trial
- 5-qubit GHZ: Estimate 9 observables (5Z + 4ZZ), SSR ≥ 1.0× (relaxed for larger system)
Relevant Literature¶
- Huang et al. (2020): Theoretical sample complexity for Pauli observables
- Chen et al. (2021): Noise robustness of classical shadows on NISQ hardware
- IBM Quantum Roadmap (2024): Error rates and calibration procedures for ibm_fez/torino
Next Steps After Completion¶
- S-T02 Noise-Aware: Run v1 + MEM on same backend, compare SSR improvement
- Phase 1 Gate Review: Submit S-T01 results as SSR ≥ 1.1× evidence
- Extended Workstreams: Launch O-T01, B-T01, M-T01 with validated shadow methodology
Part of Phase 1 Research Plan¶
S-T01 is the Phase 1 exit gate experiment for shadows workstream. Without S-T01 SSR ≥ 1.1× demonstration, Phase 1 cannot close.
Dependencies: SMOKE-HW (completed Nov 3, 2025) Blocks: Phase 1 gate review, S-T02 execution Timeline: Target completion by Nov 15, 2025