S-T02: Noise-Aware GHZ with MEM - Rationale¶
Experiment ID: S-T02 Workstream: S (Shadows) Status: Planned (Target: Nov 2025) Phase: Phase 1 Foundation & R&D
Overview¶
S-T02 demonstrates noise-aware classical shadows (v1) with measurement error mitigation (MEM) on IBM quantum hardware. This experiment directly compares v0 baseline (S-T01) vs. v1 noise-aware performance to quantify variance reduction and SSR improvement from inverse channel correction.
Scientific Rationale¶
Why This Experiment?¶
- v1 Validation: First hardware test of noise-aware inverse channel + MEM combination
- Mitigation Effectiveness: Quantify 20-30% variance reduction target from mitigation
- SSR Improvement: Demonstrate that v1 achieves SSR ≥ 1.1× even if v0 (S-T01) fails
- Phase 2 Preparation: Validate mitigation stack before fermionic shadows (S-T03) and adaptive sampling (S-T04)
Why Noise-Aware Shadows?¶
Theory (Chen et al. 2021): - Inverse channel corrects for known noise (gate errors, T1/T2 decay) - Expected variance reduction: 20-30% for typical IBM noise levels - Enables sample complexity closer to ideal (SMOKE-SIM) performance
Connection to Larger Research Plan¶
Mitigation Chain:
S-T01 (v0 baseline) ──> S-T02 (v1 + MEM) ──> Phase 2 v2/v3/v4
│ │ │
└─> SSR_v0 └─> SSR_v1 └─> Advanced mitigation
(lower bound) (Phase 1 target) (Phase 2+)
Enables: S-T03 (fermionic), S-T04 (adaptive), C-T02 (LiH with v1), Phase 2 campaigns
Expected Outcomes¶
| Metric | v0 (S-T01) | v1 (S-T02) Target | Improvement |
|---|---|---|---|
| SSR | 1.1-1.3× | 1.3-1.5× | +0.2× |
| Variance Reduction | Baseline | 20-30% ↓ | v1 advantage |
| CI Coverage | 80% | 85-90% | Tighter CIs |
Relevant Literature¶
- Chen et al. (2021): "Robust shadow estimation" - inverse channel theory
- Temme et al. (2017): Measurement error mitigation (MEM) foundations
- Kandala et al. (2019): MEM + ZNE for VQE - mitigation synergy
Next Steps After Completion¶
- Phase 1 Completion: v1 validated for cross-workstream use
- S-T03 Fermionic: Apply v1 to 2-RDM estimation
- C-T02 LiH: Use v1 for chemistry scaling experiments
Part of Phase 1 Research Plan¶
S-T02 completes the shadows mitigation validation: - ✅ v0 validated (S-T01) - 🔄 v1 validation (S-T02 - this experiment) - ⏳ v2/v3/v4 development (Phase 2)
Timeline: Nov 2025 Priority: HIGH (Phase 1 exit criterion)